Scope of works
Road construction: carriageway build-up, kerb blocks and traffic signage, delivered as the Road 8 repositioning works at Jeddah Islamic Port (Phases 1 and 2).
Road construction: carriageway build-up, kerb blocks and traffic signage, delivered as the Road 8 repositioning works at Jeddah Islamic Port (Phases 1 and 2).